2014 Engineering
Engineering the Re-build
The work of engineering the re-build of the trestles was in the hands of NE Municorr and an engineering firm completed the work in 2014 and gave them an idea of the costs of the re-build.
Map of Cold Lake Trestle area
Locally supported by:
Show Menu
Places
History of the Iron Horse Trail
2001 Election Year