Although we are not involved in actual construction of the waterpipelines we have always needed a presence to make sure contractors are following safety guidelines with detours and that the surface is put back to specifications agreed upon in the initial contracts.
Here a group of RRTS members and NE Municorr work with the waterline officials on an inspection.
Looking over an open cut near Smoky Lake
Looking at possible long term safety issues near Smoky Lake
Some construction near Smoky Lake
A waterline repair near Elk Point
Weaver Welding, a main contractor, thought highly of the IHT project and our cooperation so they donated repairs to the Danyluk Hill, worth $25000.
Danyluk Hill, near Smoky Lake, repairs being completed