2009 Trail Resurfacing Grant

Our plan as we got money from the federal and provincial governments was to fix up our trail surface and other assets. A lot of work got done in a hurry including the initial grant writing which could be done because we had some basic engineering done beforehand by ADCOMM. 

4%20-%20AB.%2016%20Oct.%205%20Gate%205%20shows%20poor%20trail%20conditions.%20Near%20Middle%20Creek.jpg

A texas gate showing poor conditions before finishing

5%20-%20AB.%2016%20Nov.%2018%20Gate%205%20after%20resurfacing.JPG

Gate after refinishing in November

Oct.%205%20AB-16%20-%202%20Mile%20Test%20Strip%3B%20Applying%20MG30.%20Located%20half%20way%20between%20881%20and%20Hwy%2029.JPG

Making a 2 mile test strip applying MG 30

Oct.%2030%20AB-16%20-%20Clay%20mix%20dumped%20and%20being%20worked%20%20on.%20Between%20Elk%20Point%20and%20Lindbergh.JPG

Clay mix dumped and being worked between Lindbergh and Elk Point

Replacing%20a%20culvert%20part%20of%20the%20resurfacing.JPG

Replacing a culvert as part of resurfacing

Resurfacing%20at%20Franchere.JPG

Resurfacing as part of work at Frachere