Our plan as we got money from the federal and provincial governments was to fix up our trail surface and other assets. A lot of work got done in a hurry including the initial grant writing which could be done because we had some basic engineering done beforehand by ADCOMM.
A texas gate showing poor conditions before finishing
Gate after refinishing in November
Making a 2 mile test strip applying MG 30
Clay mix dumped and being worked between Lindbergh and Elk Point
Replacing a culvert as part of resurfacing
Resurfacing as part of work at Frachere